Journal abbreviation: Critical Path AIDS project
The abbreviation of the journal title "Critical Path AIDS project" is "Crit. Path AIDS Proj.". It is the recommended abbreviation to be used for abstracting, indexing and referencing purposes and meets all criteria of the ISO 4 standard for abbreviating names of scientific journals.
Abbreviation rules
The table below outlines in detail the ISO 4 rules and matches to the ISSN maintained list of title word abbreviations (TWA) to derive the abbreviation.
| Title | Abbreviation | Word/Stem/Rule |
|---|---|---|
| Critical | Crit. | matches the stem "critica-" |
| Path | Path | No abbreviation listed in TWA. |
| AIDS | AIDS | Rule 4.4: Acronyms shall be retained in the abbreviated title. |
| project | Proj. | matches the stem "project-" |
Abbreviation systems
The ISO 4 abbreviation system, created by the International Organization for Standardization, serves to abbreviate journal titles in a consistent manner. This method streamlines citation processes and enhances the clarity of journal identification within academic settings.
Journal title abbreviations include ISO (International Organization for Standardization) for a wide range of subjects, NLM (National Library of Medicine) for biomedical and life sciences, and CASSI (CAS Source Index) for chemistry and related fields.
About the journal
| Full journal title | Critical Path AIDS project |
|---|---|
| Abbreviation | Crit. Path AIDS Proj. |
| ISSN (print) | 1085-7605 |
| ISSN (online) | NA |
| NLM catalog | 9886098 |